Pages

Monday, April 17, 2017

PML Lunar Express Build, Part 22, Tying It Together



The parachute shroud lines were much thicker than what I am used to!

Small loops are tied at the centers of each line. These are passed through the nylon strap.

An overhand knot is made over the shroud lines locking them 1/3 the way down from the nose cone.




The end of the nylon strap is tied off at the piston ring.
This finishes off the build!

2 comments: