The instructions said this upper Demon wrap is the most difficult to apply but I didn't have any problems.
The New Way instructions said to place it 1/2" down from the top of the tube. The old Estes catalog pictures showed it about 1/8" from the top. The 1/8" spacing looked too tight for me. I compromised at a 1/4" spacing.
The finished square Demon looks great!
The New Way square tubing does need some extra filling and smooth sanding. This was a fun build and an escape from the ordinary
The face card says it uses a D12-3 engine. My build weighs in at about 4 oz.
I would think a D12-5 is a better fit.
I'm looking forward to flying this one.
LAUNCH UPDATE: From the January 9 NEFAR Launch, scroll down to the bottom:
CLICK HERE
No comments:
Post a Comment