Thursday, August 30, 2018
Vashon Valkyrie II Build, Part 5, Prepping the Parts - Launcher
There were three dowel legs, 3/8" diameter x 8" long.
One leg was broken, the grain in that leg runs diagonally. It was probably broken when pressed into the tight base holes shown below. The fit was very tight.
This is a simple fix, some yellow glue, a clamp and sanding.
This is the round base, the top surface is on the left, the bottom view on the right.
In the center is the hole drilled for the 1/8" diameter launch rod.
The launcher base is friction fitted together, no glue needed.
It reminds me of the wood dowel launcher that Estes once produced for the Moon Mutt Starter Set.
Subscribe to:
Post Comments (Atom)
Are the launch rods the same size as back in the day?
ReplyDeleteHi Anonymous,
DeleteThe launch rods seem the same, 36" long in two 18" sections. they fit a standard 1/8" launch lug.