Back to the Enerjet by Aerotech Strong Arm build.
To see the first four posts: CLICK HERE
After sanding the CWF to surface,
The tubes got a shot of filler/primer.
Notice the masking tape set inside the tube end to keep the interior surfaces clean.
On the right is the same tube after sanding. Filler/Primer fills what seam lines were left after the first CWF pass. Only this two-step fill is necessary.
The edges of the tubes got a wipe of CA glue using a Q-tip.
Use your fingers as a depth gauge keeping the CA line even.
The centering ring glue fillets are up inside the tube, not near the CA'd edge. Wood glue or epoxy won't soak into the tube if the CA glue has sealed it off.
This gives you a hard, stronger edge tube.
No comments:
Post a Comment