The glue spacing between the assemblies is set using the vanes between the segments. No glue on the vanes yet.
These are the larger vanes between the two low tube/ring assemblies.
Here's the middle tube/ring segment in place.
Apply a thin glue fillet to the upper open joint. After this glue dries, slide out the lower vanes and apply a thin fillet to the lower joint.
NOTE: I mentioned a thin fillet. A large fillet could interfere with the fit of the vane corners.
Here's where the highest ring will end up below and inside the upper assembly.
No comments:
Post a Comment