Monday, December 10, 2018

Semroc Saturn 1B, Build, OOP #KS-1, Part 40 Notching the H-1 Tubes

Four of the BT-51N tubes have to be notched to fit around the four engine cluster mount. Notch only four!

Mark the tubes for a slot 3/8" wide by 2 7/8" tall.
The long sides were marked in pencil using the aluminum angle.
The top mark was penciled using a wrap of masking tape to be sure it was square.

Use the aluminum angle as a knife guide to make the vertical cuts.





Here's four of the eight fuel tube engines, cut to fit around the four engine mount.

Build time this post: 0 hour, 30 minutes
Total build time so far: 38 hours, 20 minutes

Centuri Kit Body Tube Lengths?

On YORF, Scott M asked:
Is there a kit by kit list of the body tubes used, and lengths, in a similar way to the published pdf for Estes kits?
I have had need lately to look up 3 different Centuri kits body tube info with very difficult to zero success . Currently I am trying to ascertain which tubes were used in the SS America 5310."


My response:
There is this:
http://www.ninfinger.org/rockets/body_tubes.html,
Scroll down for the Centuri information.
To get tube names for the lengths, go to the Semroc page: 
http://www.semroc.com/Store/scripts...s.asp?SKU=KV-77
and click on the PDF instruction manual.

Scroll down to the parts view.
If Body Tube "C" is designated as ST-16120, it is a 16 series tube, 12" long.
If the tube were designated as ST-1675, it's another ST-16 series tube, 7.5" long.

That should get you started - The older Semroc website is a great source for builds.


While Estes body tube names never made sense, except that a BT-50 is larger diameter than a BT-20. Three BT-20s do fit into a BT-60, but that's where it ends.

Centuri tubes were always easier to figure out. 
The first numbers after the "ST" name were the tube diameter.
A ST-10 was close to 1" diameter.
A ST-18 was close to 1.8" diameter.
As explained above, more numbers gave the tube length.
An ST-1865 would be a ST-18 tube that was 6 1/2" long. 

Sunday, December 9, 2018

Semroc Saturn 1B, Build, OOP #KS-1, Part 39, Primer Filler Sanding the H-1 Tubes

Wow! I mentioned before, there are a lot of tube seams to fill. On this post I concentrated on the eight BT-51, H-1 engine tubes.

The CWF was already applied in the tube seams. After the filler dried it was reduced with 220 grit followed by 400 grit sanding the filler beads even with the body tube surface.

Next all eight tubes got a fairly heavy single coat of Duplicolor Filler/Primer.
I could only shoot two tubes at a time, so this added 30 minutes to the build time.


After the filler/primer dried -
The bulk of the filler was removed with 220 grit. Sand until you see the white tube wrap starts to show.


I didn't sand all the way to the ends of the tubes. These BT-51 tubes are thin, I didn't want to round over the ends.


TIP: Stick your thumb into the tube to act as a "bumper". With the base of your thumb skin bulging out, the sandpaper shouldn't get close to the end of the tube. Notice the gray primer left around the lip of the tube end.





The remaining primer on the end was taken down using 220 grit on a sanding block.

Notice the lower half of the tube end is white, the upper half is yet to be sanded.


The upper picture shows the tube after sanding with 220 grit. Most all the filler/primer has been sanded off.



Here's the tube after following up with 400 grit sandpaper.
Gray filler/primer is left in some tube recesses and what didn't get filled in the CWF seam treatment. Each tube took 15 minutes to sand.


Build time this post: 2 hour, 00 minutes
Total build time so far: 37 hours, 50 minutes

Saturday, December 8, 2018

You're a Model What?

I did a search for the Estes Nose Cone Reference to find some lengths of the BNC-50Y and BNC-20B.
Of course, a link to the Estes website came up:
Enlarge to read - 


I guess a "Model" Racketeer sets a good example for all the shysters.


Semroc Saturn 1B, Build, OOP #KS-1, Part 38, New Vector Control Housings & Capsule Cover



Just under half of the dowel back was carved off.
Leave a little more than half the dowel diameter so a body tube curve can be sanded on the underside.

My old sanding block has a curved side. The 220 made a concave dip on the underside.


Here's the fit of the housing on the large kit tube.

The housings were then cut to length.

Changing the model over to the SA-205 configuration means more changes.
I never liked the drawn details on the capsule wrap. The SA-205 had a white protective cover that was jettisoned with the escape tower after launch.
This printed wrap looks more like the capsule after the tower and cover were gone. The wrap was peeled off and the glue cleaned off.


I printed off another wrap and flipped it over with the print on the inside.
I'll be adding some subtle raised details later on.

Build time this post: 0 hour, 30 minutes
Total build time so far: 35 hours, 50 minutes

Friday, December 7, 2018

The Elusive LPR Whistle Rocket, Part 2

My Odd'l Rocket Cyclone model does whistle on the way up. It's not loud, but can be heard during the coast phase of the engine burn.
The Cyclone has a hole punched in the side of the body tube to allow some of the ejection charge to vent like the old Estes Scout. That hole along with the the hollow area above the engine is the right area to make an audible whistle. The air flow is split at the low edge of the punched hole.
I tried to take this idea of a split air stream to make a louder whistle. The whistle has to be loud enough to be heard from the ground.

I thought maybe strategically placed hole might get a good whistle, but I didn't want to go through a dozen test flight variations.
Then it hit me, I could get a whistle while dong a swing test.


Here's my test model, a simple 3FNC rocket. My plan was to have three of these around a central core. The central core would have the engine and parachute. Each of the three "strap-on" whistlers could be tuned to a different note possibly making up a major chord triad of Do-Mi-So.

A Kevlar swing string was tied an taped on at the C/G point.




In the back is a capped engine block. The block could be slid up and down for "tuning". The capped block wasn't glued in. Using a dowel I could change the interior cavity size by sliding it up and down inside the tube. The right position might find a whistle "sweet spot".
Here's some of the tests - 

Test 1: A small hole was drilled near the top of the nose cone. The base of the nose cone was cut off to allow the air to past through to the body tube. The model was swing tested at a fast enough speed where a whistle should happen. Very little wind noise was heard.

Test 2: This upper nose cone hole was taped over and a hole was punched in the body tube. Swing testing again led to wind noise and deflection but no real whistle.

Test 3: The top of the nose cone was cut off at an angle. More swing tests got a whistle, but not loud enough.



Test 4: This cut make the most noise but still not loud enough to be heard over the engine.
The problem is the speed of the rocket has to be consistent to activate the perfect whistle design. Who knows what speed and whistle shape could work together to produce a audible result?

I had hope for some better results this time. I'm only out an hour of time and three nose cones.

Semroc Saturn 1B, Build, OOP #KS-1, Part 37, New Vector Control Housings

Because I'm changing the model to the SA-205 design, the Vector Control Housings will also be changed. The shape is much simpler than the earlier SA-2001 shape.





I tried to make the vector control housings out of a 5/16" diameter dowel. The angled top was simply sanded with 200 grit on a block.
The problem was, I couldn't get the base line straight and consistent.

I put a longer than needed dowel in my electric drill for a makeshift lathe.
TIP: You can also make small nose cones this way.

The dowel had to be chucked a few times to be sure it was in straight. Tighten it down and run the drill. If the dowel wobbles, re-set the dowel and check it again.


With the drill spinning, a pencil line was drawn.

The top angle was shaped on some 100 grit on an older sanding block. Follow and smooth with 220 and 400 grits.






Make two dowels with the tops tapered.

Build time this post: 0 hour, 20 minutes
Total build time so far: 35 hours, 20 minutes