Friday, December 7, 2018

Semroc Saturn 1B, Build, OOP #KS-1, Part 37, New Vector Control Housings

Because I'm changing the model to the SA-205 design, the Vector Control Housings will also be changed. The shape is much simpler than the earlier SA-2001 shape.





I tried to make the vector control housings out of a 5/16" diameter dowel. The angled top was simply sanded with 200 grit on a block.
The problem was, I couldn't get the base line straight and consistent.

I put a longer than needed dowel in my electric drill for a makeshift lathe.
TIP: You can also make small nose cones this way.

The dowel had to be chucked a few times to be sure it was in straight. Tighten it down and run the drill. If the dowel wobbles, re-set the dowel and check it again.


With the drill spinning, a pencil line was drawn.

The top angle was shaped on some 100 grit on an older sanding block. Follow and smooth with 220 and 400 grits.






Make two dowels with the tops tapered.

Build time this post: 0 hour, 20 minutes
Total build time so far: 35 hours, 20 minutes

No comments:

Post a Comment