Thursday, December 23, 2010

Cyclone Build Part 2 Parts

Here's (almost) all the parts after cutting them out.





The model will be built in two separate assemblies according to Mr. Mills instructions.



First up in the build is the single finned Spin Unit (to the left)
The 1/8" dowel fin weight is not shown.

The two finned Stabilizer Unit (on the right) holds the engine mount.

All balsa part dimensions are available at Jonathan Mill's website HERE.

The 1" long AR-520 adapter and 1/4" adapter were made from an empty engine casing.

Click on the pictures for an enlargement.

No comments:

Post a Comment