
Here's all the parts set out ready for assembly.
This was a different build for me. I don't remember ever pre-painting every part before gluing it together.
First up are the vanes.
The fin lines were marked and a thin line of paint was scraped off for better adhesion.

The vanes were set in place with white glue.
After the white glue had dried, a small drop of super glue was set in the middle of each root edge, near the silver / black mask line.
A toothpick tip was used to "drag" that drop of CA down the root edge.
Here's the back end view with all the vanes in place.
No comments:
Post a Comment