Saturday, July 23, 2016
Estes Red Max Build, Part 6, Launch Lugs and Primer
The launch lugs are short, shorter than I remember.
After they were lightly tacked down and the glue dried, a rod was used to make sure they were in line.
TIP: When gluing lugs and fins try using very little glue initially.
It doesn't take much glue to tack them on. If they dry and end up out of line, it's easier to remove the parts and try again.
The fins and body tube will be shot separately with primer/filler.
A strip of masking tape the length of the root edge was set down the fin position pencil lines.
After the primer/filler dried you can see some raised pore lines.
The was also some open pores. The open grain got a rub of CWF and smooth sanding.
The primer/filler helps to fill whats left of the nose cone molding seam. You won't see this until the primer/filler is sanded down.
Labels:
Build,
E Red Max,
Estes,
Filling Seams,
Launch Lug,
Primer,
Tips
Subscribe to:
Post Comments (Atom)
The launch lugs are the same size as the original kit when it first came out.
ReplyDeleteLeo
Thanks Leo!
DeleteThey sure seem short to me . . .