Saturday, October 22, 2011
Batter Up Build Part 2 Drill and Interior Tube
A BT-20 was centered over the end and traced around with a fine point Sharpie pen.
Using a new blade, the interior of the BT-20 diameter circle was removed.
If this circular cut fits the tube well, it should give enough support. There is no way to insert any centering rings inside the body of the bat.
The finger indents actually hug the Bt-20 very well. It made a good friction fit inside the bat handle end.
The front end of the bat was marked and a circle cut like the rear end.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment