Tuesday, November 27, 2012

Dr. Zooch Saturn V Detail Pieces S-IVB APMs Step 11 Part 1

There is a lot of information in Step 11
The detail parts build will go around the page from the top, 11 o'clock position around the page in a counter clockwise direction.

On the left are the S-IVB APMs on my earlier build of the Zooch Saturn V.

These were cut from tongue depressor (or craft stick) wood.
Two rectangular pieces, 3/8" X 3/16" are needed for the bases.
The center “steps” are about 1/16" wide.



The center steps were glued on using CA glue. They were cut longer than the base pieces and will be sanded to the length of the bases.

No comments:

Post a Comment