
A couple more half rounds were needed on the lower wrap.

The front was marked and sanded at the correct (or close) angle.
The bottom is marked for cutting.
I'll usually cut a little long and sand it to the right length.

Here's the tunnel ready for sealing and sanding.
No comments:
Post a Comment