Monday, September 12, 2011

Semroc Baby Orion Build Part 11 Details and Filling



This is all fourteen wrap trim pieces cut and shaped. These are not glued on yet.

I'll seal all with varnish, two coats sanding between coats.



All the parts needing filling are shown on the right.
Seven nose cones, three fins, three standoffs, four body tube seams and a launch lug.
The three BT-3 tank tubes are stacked on a dowel to have thinned CWF brushed on.
The launch lug is on two toothpicks for a brushing handle.

No comments:

Post a Comment