Monday, October 27, 2014

Estes Patriot Build #2056, Part 6, Coupler Bulkhead



The matte board disk was punched for the shock cord tie.
In the center a rectangular second piece was glued on for more support.


The disk was glued over the top edge of the coupler.
Any overhanging edge was sanded flush with the outside diameter of the coupler.

The coupler and end bulkhead assembly was glued into the yellow tube and fillets applied.

Build time:
Make coupler bulkhead = 30 minutes
Total build time so far = 1 hour 40 minutes

No comments:

Post a Comment