Friday, March 16, 2012

Dr. Zooch SLS Build Part 20 SRB Bands




You can see the rough edge around the shoulder of the nose cone.
I cut the uppermost white strip a little wide so it would overlap the top and cover the rough lip of the nose cone.







This is the overlap strip in place, covering up the rough balsa lip.






Near the bottom, two of the band strips are a triple thickness.
I used the back end of a very dull razor blade to help evenly space out the strips while the glue was still wet.





Finally, one of the two the finished SRBs.
Adding all those wrap strips really adds a great dimension to the model.

No comments:

Post a Comment