After all eight diagonal stripes were in place the 3/8" horizontal stripes were lifted up.
The small positioning piece was removed. The diagonal overlaps were cut at the halfway point so the 3/8" horizontal stripe will cover the ends when it was stuck down again.
The same was done at the nose cone end.
The diagonal stripes were cut where the went over the nose cone joint.
No comments:
Post a Comment