
You'd think the launch lugs would have been glued on earlier. But, positioning of the lugs is important , the lower lug goes to one side of a SRB.
Here's the upper lug being lined up with a 1/8" rod.
Enlarge the picture and you can see a pencil line drawn beside the rod.
This line is for reference. I'll have to scrape and sand off some paint for better adhesion of the white glue.

The paint was lightly scraped off and a little of the blue wrap cut out.
I should have layed the blue wrap on after gluing the lug. The seam would have been hidden on either side of the launch lug.
No comments:
Post a Comment